Maintenance points of WD120-23.5-1 Worm gear reducer

Publish Time: 2025-09-02     Origin: Site

WD120‑23.5‑1 is a single-stage worm gear reducer with a worm lower position, a center distance of 120 mm, and a nominal speed ratio of about 23.5. It is suitable for situations where large speed ratios, stable transmission and possible reverse self-locking; however, friction heating and centralization requirements are high, and strict lubrication and temperature rise management are required.


Maintenance points (execute immediately)

  • Installation and alignment

    • Horizontal/firm installation, elastic coupling for input and toothed coupling for output, hammering and disassembly; the centering error of the whole machine ≤ the allowable compensation amount of the coupling.

    • After installation, the manual wheel is flexible; no load is 1-3 hours, part load is intermittently operated and then full load, and the temperature rise and noise are monitored during the period.

  • Lubrication and oil change

    • Change the oil for the first time at 300–500 hours; then continuously run every 2000–3000 hours or 6 months, ≤10 hours/day every 4000 hours or 12 months; change the oil with the same brand and clean it and then add new oil.


    • Check the oil level to 2/3 of the oil window when the shutdown state is completed; give priority to the special oil for extreme pressure worm gear and worm gear, low temperature or high/heavy load, and follow the manual to increase viscosity or use synthetic oil instead.

  • Operation monitoring

    • Temperature rise ≤60 K, oil temperature ≤85–100℃; abnormal temperature rise/abnormal noise/vibration/leakage will be stopped immediately for inspection.

    • Ambient temperature > 40°C or continuous full load, strengthen ventilation/air-cooling or forced lubrication.

  • Periodic check

    • Week/month: Appearance, oil level/oil quality, bolts, leakage.


    • Quarter: Vibration/temperature trend, noise, oil sample detection if necessary (viscosity, acid value, moisture, iron spectrum).

    • Half a year/year: Remove and inspect the seal, bearing, meshing gap and contact spots; replace the wear parts and run and load them.

  • Environment and working conditions

    • Dust-heat/corrosive environment, strengthen protection and sealing, and shorten the oil change and inspection cycle.

    • Preheat or heat tracing before starting at low temperature to avoid poor lubrication of high viscosity oil.


FEEDBACK

How to repair and maintain the FF47-146-0.75KW reducer chassis vibrates

Application field of WHC150-54-II arc cylindrical worm gear reducer

How to ensure the firmness of the installation foundation of the NGW73-224 planetary gear reducer

Installation steps of WD250-53-V worm gear reducer

Which industries or application scenarios are more suitable for using B2SV05-5-B high-power gear box